Monday, December 8, 2008

Dodger Project



Corine has updated the new dodger by adding some reinforcing stanchions.

The dodger protected us really well offshore, with the exception of one minor drip. The drip was caused by a small pool that occurred during the heaviest rain. I have to say that the storm we went through set a rainfall record in San Diego.







The new stanchions have tightened the top panel like a drum. They also make an extremely strong handhold on both the top and on the side decks.













No comments:

The Cruising Yacht SiteRing

Previous | List | Random | Join | Next

SiteRing by Bravenet.com